tagboard profile affiliates

• Saturday, January 19, 2008 at 7:36 PM •

3 yrs... its fast... soon, it will be ending... i would like to make some round ups... =)


Projects

most 'unbelievable' : cel 2.2's PBL (river water analysis)
who the hell would go to the river to collect water for analysis in school. WE DID! had our own version of sampling bottle n sampling methods. wats more, we chose Sungei Pandan, which is a river with ship hulls on one end n no water at the other end...

most '灵异' : I&E (Events Mangement)'s API Ghost Tour
first time to mange this kind of event. although we outsource it to API, but we ensured tt everybody is safe~~~ cemetry, the Song Sisters Houses n more... spine chilling but knowledge is gained... ever seen grave digging??? or burning???

most satisfying: Process Engineering Design (FYP)
The only semester long project we handle, combining all of wat we had learned or were learning. Most of the things, we had only learned the basics. We have to stay in the library n booked books n all. spending a lot of our times outside our lectures/tutorials/practicals. The last few nights r the most distarous. MOST OF US ARE LACK OF SLEEP!!! n i made a stupid small mistake n Charles Ong made it until like 'its the end'. but in the end, both of us got great grades. BUT, it’s just so satisfying just by handing in the hundred over pages full of report to him on the deadline.

most devastating: thermodynamics’
my failure project. Because I gei kang. Go do all those efficiencies of the units. If not the efficiencies, my group did one of the best according to Charles Ong. I was so sad that I skipped IPC’s lecture n tutorial. n Charles Ong have to counsel me after Jun Yan they all found me after lecture. But that is when realization came that there are 3 frens that r always there. (But it seems that I had demolished it during sem 3.1)

art n craft: OBC cum ICBE poster making
that is the time when we cut a lot. We did a circle poster that is 3 layers thick (2 semicircles, 1 full circle n a ring) n its all made of plastic boards. Cut manually by our own hands. We also cut out the word 'BEER' from the plastic board. Tiring is the only word. Other than the boards, we cut papers n all. We even made us our own ‘compass’ to draw up the circles.

Most ‘interesting’: TPFF’s
Doing project whereby we have to go to the swimming pool now n then. Stay at the side of the swimming pool. Measuring lengths of our imagining pipes using a measuring tape. Collecting swimming pool sample using an empty ‘fruit tree’ bottle, (which after that, I accidentally wanna drink it!). n tze wei going into the swimming pool to count the number of the water inlet of the pool. Not forgetting creating a big mess at Jun Yan’s place to finish up the project because we did not want others to have a look at our poster.

Module

never forget: CPTP in CPTC
had really learned a lot of things in CPTC. 6 weeks in Jurong Island, an unique experience. Life is just ups n downs there. With SP's CEs there, its always just like a competition. Remembered how AH PA taught us it the practicals n how we always complain to him tt the SPs r always sitting in front n we r always at their back. Remembered the cold wars n our reunions. not forgetting our 1 day, 2 nights of 12-hours shift n the last day of the program when all of us get our certs...

most 成就感: RENG/PED

RENG is the only module which I had secured the Module Prize. I’m not really convinced as I had slacked quite a lot in her lectures, leaving me to listen to her tutorials only. N there is PED, the project module (FYP). As mentioned above, it’s a very rewarding module. Although Charles Ong had said that we will be getting a grade down, but in the end it’s an A+. wats more with the moment of handing up of the report. It’s just so fulfilling.

Most ???: ENV/PCON

ENV, the lecturer let us went ??? because she also ???. PCON, the lecturer is too pro till we go ???. It’s just something that all of us agreed on.

Wanna give up: OHS

The module that had nothing to study but everything to memorize. Wats more, I’m the kind of person that cannot memorize. It’s only 2 credits but every week we have to hand in a report. Ended up with the worst core module grade. Serve me right.

Most unexpecting: IAP (Nestle)

It’s very different from wat people think it is inside Nestle. I’m not the only person to say so, but a lot others also. Everything is just so different from wat we had studied. Wats more, I’m involved in introduction of new raw material and stuff. 1st thought that people are weird and stuff but after interacting with them, they are just normal and/or just doing their job.


Oh ya! in these 3 yrs i did did some things that are out of expectations.

I played Maple after much persuasions of my pals. I also had this blog. n did a lot of things that are out of expectations. i went to lectures but not listening to it. late of lectures also dun care. even played maple in the lectures. =x bad me...





Jason Chen - Thank You

Fergie - Big Girls Don't Cry

Olinda Cho - Don't Look Behind